Product Range/Platform 03
Welding Platform

Laser-Arc Hybrid Welding Production Line for H-Beam & Box Column

The line that removed groove preparation from the process. Single-side welding with double-side formation, one pass, at 1.5–2.2 m/min — against 0.3 m/min for gas-shielded or submerged arc welding.

20 kW hybrid No groove required ≤ 16 / 30 mm Third-party tested
Laser-arc hybrid welding production line for H-beam and box column
Welding speed
1.5 – 2.2 m/min
Speed gain
3 – 4 ×
≤ 16 / 30mm
Single-side / double-side weld thickness
≤ 2m/min
Weld tracking speed
< 0.02mm
Tracking accuracy
> 99.8%
Copper mirror reflectivity
The Technology

Why laser and arc, together, beat either one alone.

Laser welding alone produces a narrow, deep keyhole but is unforgiving about fit-up. Arc welding alone is tolerant but slow and heat-heavy. Coupling them produces a stabilised hybrid heat source that is both fast and forgiving.

Keyhole stabilisation

The interaction between the laser and the gas-shielded arc stabilises the laser keyhole and enhances bubble escape from the weld pool — eliminating porosity defects in the joint.

Greater penetration

The arc is attracted and compressed by the laser, raising current density. The result is deep penetration with single-side welding and double-side formation — a full-penetration joint.

Forgiving fit-up

The hybrid heat source substantially reduces sensitivity to assembly gap, alignment offset and misalignment — relaxing the clamping accuracy that pure laser welding demands.

Speed from auxiliary heating

The electric arc pre-heats the joint, allowing a higher laser travel speed than the laser alone could sustain at the same penetration.

Low heat input

5–8 kJ/cm with element dilution below 5 %. Narrow heat-affected zone, low distortion, and corrosion resistance (PRE value) deviating less than 5 % from the base material.

No groove preparation

Single-pass, one-time formation of a full weld without beveling on material up to 16 mm. Below that threshold the groove, the filler wire and the labour all disappear.

Process Comparison

Three welding methods, measured against each other.

Submerged arc welding (SAW) and gas-shielded arc welding (GMAW) versus laser-arc hybrid welding, across the parameters that decide the cost of a fabricated ton.

Parameter SAW GMAW Laser-Arc Hybrid
Groove type (< 16 mm)V-grooveV-grooveNo groove preparation required
Groove type (> 16 mm)V or U-grooveV or U-grooveY-groove
DistortionHighHighLow
Heat-affected zoneLargeLargeNarrow
Weld qualityExcellentExcellentExcellent
Wire consumption, 16 mm plate (CNY/m)1.51.50.4
Weld width10 – 16 mm5 – 10 mm3 – 8 mm
Weld reinforcement5 – 10 mm3 – 8 mm2 – 8 mm
Welding speed0.3 – 0.6 m/min0.5 – 0.8 m/min1.5 – 2 m/min
Weld penetration5 – 12 mm3 – 8 mm5 – 18 mm

Speed, visualised

Laser-Arc Hybrid Welding1.5 – 3.0 m/min
Gantry submerged arc welding0.6 – 1.0 m/min
GMAW / SAW0.3 – 0.5 m/min

Wire consumption, visualised

Laser-Arc Hybrid Welding0.4 CNY/m
GMAW / SAW1.5 CNY/m
Reduction−73 %

Based on 16 mm thick plate. Wire is not merely cheaper per metre — less of it is needed, and less weld metal means less distortion.

Joint Configurations

Six joint types, all achievable on the same line.

A — Single-side welding with double-side formation

The benchmark configuration. The joint is welded from one side only and forms a full-penetration weld on both sides — no back-gouging, no second pass, no workpiece flip. For web thickness ≤ 16 mm no groove preparation is required at all.

B — Root pass

On thicker material the hybrid process lays the root pass with a 16 mm root face retained, after which the remaining groove is filled by GMAW or SAW. The expensive, slow part of the joint is done at laser speed; the cheap part is done with conventional filler.

C — Double-side welding with formation on both sides

For plate above 16 mm and up to 30 mm, the joint is welded from both sides. The hybrid source produces a Y-groove preparation instead of the deep V or U groove that arc methods would need.

D — Fillet weld, double-side welding and formation

The workhorse joint for stiffeners and web-to-flange connections, welded from both sides with full formation and a small, clean leg.

E — U-rib single-side welding with formation

Orthotropic bridge deck U-ribs welded from the accessible side only, with formation achieved through to the far side — critical where the closed rib geometry makes two-sided access impossible.

F — Box girder single-side welding with formation

Closed box sections welded from the outside while achieving full penetration — no internal access, no internal welding, no post-weld inspection of an unreachable joint.

Workpiece Range

What the line will weld.

H-section steel

  • Web width: 200 – 4000 mm
  • Flange height: 200 – 500 mm
  • Workpiece length: 1 200 – 20 000 mm
  • Single-side welding for web thickness ≤ 16 mm
  • Double-side welding for web thickness ≤ 30 mm

Box column

  • Width: 200 – 1500 mm
  • Height: 200 – 1500 mm
  • Workpiece length: 1 200 – 20 000 mm
  • Plate ≤ 16 mm: no groove, single-side welding with double-side formation
  • Plate > 16 mm: Y-groove with 16 mm root face — hybrid root pass, GMAW or SAW fill

Precision steel

High-purity, high-precision section with accurate dimensions, excellent surface finish and thin-wall, sharp-corner profiles.

T-beams

Fillet-welded T sections for bridges, machinery and transportation structures.

Other open sections

Any relatively open structural steel product with accessible angle-weld seams.

Verified Weld Properties

Independent third-party test data.

Butt-welded plate samples, all welded with the laser-arc hybrid process and—critically—with no groove preparation. Each sample was tested for internal defects and mechanical performance by an independent laboratory.

Q235 — 300 × 450 × 16 mm, no groove
TestStandardResult
Ultrasonic testingGrade 1 acceptableGrade 1 — acceptable
X-ray testingGrade 2 acceptableGrade 1 — acceptable
Tensile test≥ 375 MPa452 – 462 MPa
Bend test180°, no cracksNo cracks
Impact test> 27 J51 – 120 J
Q355B — 300 × 450 × 16 mm, no groove
TestStandardResult
Ultrasonic testingGrade 1 acceptableGrade 1 — acceptable
X-ray testingGrade 2 acceptableGrade 1 — acceptable
Tensile test≥ 470 MPa560 – 574 MPa
Bend test180°, no cracksNo cracks
Impact test≥ 34 J65 – 83 J
Q355NE cross joint — 300 × 450 × 24 mm, double-side hybrid, no groove
TestStandardResult
Ultrasonic testingGrade 1 acceptableGrade 1 — acceptable
Tensile test≥ 470 MPa554 – 563 MPa
Bend test180°, no cracksNo cracks
Impact test at −40 °C≥ 34 J58 – 66 J
SN490B — 300 × 450 × 16 mm, no groove
TestStandardResult
Ultrasonic testingGrade 1 acceptableGrade 1 — acceptable
X-ray testingGrade 2 acceptableGrade 1 — acceptable
Tensile test≥ 560 MPa680 – 686 MPa
Bend test180°, no cracksNo cracks
S690 — 300 × 450 × 30 mm, double-side hybrid, no groove
TestStandardResult
Ultrasonic testingGrade 1 acceptableGrade 1 — acceptable
X-ray testingGrade 2 acceptableGrade 1 — acceptable
Tensile test≥ 710 MPa866 – 878 MPa
Bend test180°, no cracksNo cracks

Third-party laboratory reports available on request. Reported values are from the specific samples tested and are indicative of process capability, not a guarantee of performance on other material grades, thicknesses or joint configurations.

Economics

Welding cost per 100 tons of box-column output.

Reference workpiece: box column 400 × 400 × 12 000 mm, plate thickness 14 mm, weight 845 kg, total weld length 48 m per column.

Cost itemLaser-Arc Hybrid (LAHW)GMAW / SAW
Total weld length100 ÷ 0.845 × 48 m = 5 680.5 m100 ÷ 0.845 × 48 m = 5 680.5 m
Welding hours (h)5 680.5 ÷ 1.6 ÷ 60 = 605 680.5 ÷ 1.0 ÷ 60 = 95
Flipping & preparation hours (h)1020
Total working time (shifts)1026.5
Labour cost (CNY)4 000 — general worker, 400/shift28 402.5 — welder, 5/m
Wire consumption (CNY)2 272 — 0.4/m7 953 — 1.4/m
Electricity cost per hour (CNY)15090
Total electricity cost (CNY)9 60017 100
Total welding cost per 100 t (CNY)4 000 + 2 272 + 9 600 = 15 87228 402.5 + 7 953 + 17 100 = 53 455.5
0%
Lower welding cost per 100 t
0%
Less labour cost
0%
Less wire consumption
0%
Reduction in shifts required

Note on the labour comparison

The conventional route requires a qualified welder at 5 CNY/m because of the skill and speed demanded by multi-pass groove work. The hybrid line needs a general worker at 400 CNY/shift — the machine does the process thinking. That is where a large share of the saving originates.

Equipment Specification

Gantry laser-arc hybrid welding production line.

ItemParameter
Welded productsH-beams, box columns, precision steel, T-beams
Processing area (L × W)28 000 × 1 500 mm (customisable)
X-axis travel> 1 500 mm
Y-axis travel> 28 000 mm
Z-axis travel> 800 mm
Single-side welding thickness≤ 16 mm
Double-side welding thickness≤ 30 mm
Welding speed1 000 – 3 000 mm/min
Laser power20 kW
Model referenceYC-FW20000-26030

Laser source

Welding-grade fibre laser source. Compact construction for on-demand start-up, high electro-optical conversion efficiency, low power consumption and superior beam quality. Flexible fibre output makes system integration straightforward.

Laser welding head

An independently developed, fully water-cooled 20 kW-class reflective copper-mirror welding head. Copper mirrors with reflectivity above 99.8 % replace conventional lenses; multi-level water cooling keeps the head below 40 °C during long-run high-power welding, preventing the focal-point drift that overheating causes. Lens life exceeds 5 000 hours — more than three times conventional technology.

Weld tracking system

A self-developed high-precision tracking system with a maximum tracking speed of 2 m/min and accuracy better than 0.02 mm. It collects real-time weld-position data during welding and dynamically adjusts head position for fully automatic operation without manual intervention.

Control system

Dedicated in-house control software with an embedded welding-process database and one-click process recall. The operator enters workpiece parameters and the system matches welding parameters automatically; combined with weld tracking, full-automatic welding is achieved.

In Production

Delivered lines, running today.

China Construction Steel Structure (Tianjin) Co., Ltd.

Box column welding. Product: box column, material thickness 16 mm, dimensions 12 000 × 500 × 200 mm. Tensile test qualified with base metal fracture; bend test passed with no cracks in the weld.

China 22MCC — Baotou production site

T-beam product welding, material thickness 12–24 mm. Impact testing on Q235 returned 47–120 J against a requirement of above 27 J — far exceeding the specified impact performance.

Changge Xinkuan Technology Co., Ltd.

Precision (refined) steel product welding — high-purity, high-precision, high-performance section for high-end buildings, curtain walls, prefabricated construction and roofing systems.

Industry standards context

The laser-arc hybrid welding process for steel structural components is now covered by a published technical standard (TCSCS 083-2026) in China. YUCON participated in the development and dissemination of that standard, and the delivered lines are engineered to comply with its requirements alongside GB, ISO, ANSI/AWS, JIS and EN welding standards.

Machine Views

The gantry, end to end.

Laser-arc hybrid welding production line
Production lineDual-rail gantry running a 28 m welding envelope
Gantry detail
Gantry detailWelding head, wire feed and tracking optics on the moving carriage
Weld quality
Weld qualityNarrow bead, small reinforcement, minimal distortion
Qualifications & Honours

National high-tech enterprise · SRDI · standards drafter.

National High-Tech EnterpriseRecognised high-technology enterprise
National Sci-Tech SMENational science & technology SME
SRDI SMESpecialised, refined, differential, innovative
Hubei Gazelle EnterpriseHigh-growth technology company
40+ Invention PatentsIndependently developed core technology
ISO Triple Certification9001 / 14001 / 45001
Chutian Talent Innovation TeamHubei Key R&D Program
30+ Countries & RegionsIncl. Vietnam, Indonesia, Korea, Russia
16 Years in Laser ManufacturingCore team, independently held IP
China's First — RepeatedlyFirst H-beam 3D five-axis line, first LAHW line, first U-rib line
National Excellent EnterpriseChina Innovation & Entrepreneurship Competition
Related Products

Other platforms in the YUCON range.

Standard Configuration

Technical Specification — typical box column duty

Based on a typical box column application (400 × 400 × 12 000 mm, 14 mm wall).

ParameterSpecification
Laser power20 kW
Suitable productsH-beam, box column and similar
Max. welding thicknesssingle side ≤ 16 mm · both sides ≤ 30 mm
Welding speed≥ 1.6 m/min
Max. welding length24 000 mm
Repeat positioning accuracy≤ 0.1 mm
Welding headFully water-cooled reflective (copper-based optics)
Lens service life> 5 000 h — about 3× conventional
Light utilisation> 99.8 %
Power stability / focal drift< ± 1 % / < ± 0.05 mm
Process featuresNo groove · single-pass full penetration
Next Step

Send us a weld sample. We will cut, weld and test it.

Provide your joint configuration, material grade and plate thickness. We will run the coupon on our application line, section it, and report penetration, hardness and mechanical results alongside a full line quotation.

WhatsApp / WeChat
+86 189 9591 2600
Helpline
400-027-3868
Email
sales@yuconlaser.com